Soil Instruments - the very best in geotechnical instrumentation
  
(返回上一页)

软地基中的隧洞 - 工程示例

Tunnels in soft ground are usually constructed by using a Tunnel Shield or the New Austrian Tunnelling Method (NATM). One of the prime concerns is the risk of settlement of the ground above the tunnel. The diagram shows a simplified cross-section of a typical tunnel in soft ground. The icons show where the instruments would normally be installed - hover over the icon that is lettered on the diagram (SP, I, PZ, etc) to see a brief description.

 

Key

SP - 测量标点
PC - 弦式压力盒
PZ - 渗压计
EX - 位移计
ST - 应变计
I - 测斜仪
TL - 隧洞衬砌压力盒
TEX - 钢尺式收敛计
BCS - 巴塞特收敛系统

 

 

公司首页 | 公司介绍 | 产品介绍 | 业务服务 | 公司项目 | 世界销售网
信息反馈 | 下载中心 | 应用表单 | 网站地图 | 联系我们